Building Control - Application Forms

Download Building Control application forms :

  • Building Regulations Application Form PDF (116.74 KB) 

  • Section 80 Demolition Notice (PDF 241.52 KB) Email This email address is being protected from spambots. You need JavaScript enabled to view it. for an accessible version of these documents.

Fee Tables:

Building Control Fee Table A Standard Charges for the Creation of New Housing*

 Building Control

CHARGE FOR  2024/25 £

Number of Dwellings

Plan Charge

Inspection Charge

Full Plans Total

Regularisation Charge

1

 214.00

 558.00

772.00

 965.00

2

 214.00

 681.00

895.00

 1,118.75

3

 214.00

 862.00

 1,076.00

 1,345.00

4

 214.00

 948.00

 1,162.00

 1,452.50

5 to 10 plots

 535.00

 246.00/ plot

To be determined

11 to 30 plots

 749.00

 225.00/ plot

31+ plots

 963.00

 214.00/ plot

There will be an additional charge for electrical work not covered under a Competent Persons Scheme. The basic charge per dwelling will be £374.50. Account will be given with regard to repetitive work and a discount may be applied. Retests will attract an additional charge. The hourly rate may be used for all other work not covered by a Competent Persons Scheme.

Unless agreed otherwise, schemes exceeding one year’s duration may be subject to an additional charge.
Regularisation charges will be determined on an individual basis.
Please note: In the unlikely event of an application being withdrawn after registration but before the Building Control Officer has commenced his work, all charges will be refunded with the exception of a non-returnable deposit of £107.00 (including VAT).

Building Control Fee Table B - Domestic extensions & certain small buildings.Building Control Fee Table B - Domestic extensions & certain small buildings.

 Building Control

CHARGE FOR 2024/25 £

Type of Work

Plan

Charge

Inspection Charge

Full Plan Total

Building Notice Charge

Regularisation Charge

Extension – floor area not exceeding

10 sq m

 214.00

355.00

569.00

597.46

711.25

Extension – floor area exceeding 10 sq m but not exceeding 40 sq m

 214.00

535.00

749.00

786.46

936.25

Extension – floor area exceeding 40 sq m

 214.00

729.00

943.00

990.16

1,178.75

Erection of a non-exempt detached domestic garage or carport up to 40 sq m

 214.00

355.00

569.00

597.46

711.25

Erection of a  non-exempt attached single storey extension of a domestic garage or carport up to 40 sq m

 214.00

445.00

659.00

691.96

823.75

For associated electrical work not covered under a Competent Persons Scheme the basic charge per application will be £374.50 (account will be given with regard to repetitive work and a discount may be applied, similarly retests will attract an additional charge).

Hourly rate may be used for all other work not covered by a Competent Persons Scheme.
Unless otherwise agreed, schemes exceeding one years duration may be subject to an additional charge.
Regularisation charge will be determined on an individual basis.

Building Control Fee Table C - Charges for domestic alterations to a single building (£).

Type of Work

Plan Charge

Inspection     Charge

Full Plan Total

Building Notice Charge

Regularisation Charge

Conversion of a roof space to form habitable room(s) that does not include the construction of a dormer

 214.00

 407.00

 621.00

 652.06

 776.25

Conversion of a roof space to form habitable room(s) that does include the construction of a dormer

 214.00

 514.00

 728.00

 764.40

 910.00

Conversion of a garage to a habitable room(s)

 214.00

 214.00

 428.00

 449.40

 535.00

Internal alteration, installation of fittings and/or structural (not electrical).  When it is intended to carry out building work on a dwelling to which Table B applies and at the same time undertake work to which this table applies, this charge only may be reduced by 50%

Fixed price based on estimated cost bands

     

Single Beam

0

 169.00

 169.00

 177.46

 211.25

Wood Burning Stove

0

 371.00

 371.00

 389.56

 463.75

£0.00 – £2,000.00

0

 310.00

 310.00

 325.50

 387.50

£2,001.00 – £5,000.00

 214.00

 157.00

 371.00

 389.56

 463.75

£5,001.00 – £10,000.00

 214.00

 235.00

 449.00

 471.46

 561.25

£10,001.00 – £20,000.00

 214.00

 348.00

 562.00

 590.10

 702.50

£20,001.00 – £30,000.00

 214.00

 407.00

 621.00

 562.06

 776.25

£30,001.00 – £50,000.00

 214.00

 514.00

 728.00

 764.40

 910.00

The introduction of insulation as part of re-roof work, re-tendering/plastering and replacement ground floors that does not include changes to structural members and the insertion of cavity wall insulation

0

 169.00

 169.00

 177.46

 211.25

Any replacement of window(s) and/or door(s) containing 50% or more glazing, no more than four in total (new openings refer to category 4 below)

Fixed price grouped by numbers of windows

0

 203.00

 203.00

 213.16

 253.75

Any replacement of window(s) and/or door(s) containing 50% or more glazing, more than four in total (new openings refer to category 4 below)

Fixed price grouped by numbers of windows

0

 225.00

 225.00

 236.26

 281.25

Electrical work (non competent persons scheme)

Retests will incur additional costs

Fixed price based on extent of the works

     

Provision of a new circuit

 214.00

 180.00

 394.00

 413.70

 492.50

      

Total rewire of dwelling

 214.00

 348.00

 562.00

 590.10

 702.50

Unless agreed otherwise, schemes exceeding one year’s duration may be subject to an additional charge.

Regularisation charge may be determined on an individual basis.

Building Control Fee Table D - All non domestic work

Building Control

CHARGE FOR  2024/25 £

Type of Work

Fixed price based on estimated cost bands

Plan Charge

Inspection Charge

Full Plan Total

Regularisation Charge

All non-domestic work (alteration, extension or new build)

£0.00 - £5,000.00

 214.00

 235.00

 449.00

 561.25

£5,001.00 - £10,000.00

 214.00

 348.00

 562.00

 702.50

£10,001.00 - £20,000.00

 214.00

 407.00

 621.00

 776.25

£20,001.00 - £30,000.00

 321.00

 353.00

 674.00

 842.50

£30,001.00 - £50,000.00

 321.00

 524.00

 845.00

 1,056.25


Note: For schemes exceeding £50,000.00 estimated contract price, the charge is individually determined.

For window replacement schemes the charge is individually determined.

Unless agreed otherwise, schemes exceeding one year’s duration may be subject to an additional charge. Regularisation charges will be determined on an individual basis.

Building Control Fee Table E - Other charges

Building Control

CHARGE

FOR

2024/25

in £

Type of Work

 cost

Demolition Notice

284.00

Dangerous structures

(out of hours)

Survey fees (per hour or part hour)

48.00

Dangerous structure

(normal hours)

Free for the first hour then survey fee applicable (per hour or part hour)

37.00

Copy Documents:- Completion Certificates

Decision notice

Exemption confirmation letter

First Copy per document

54.00

Additional copies per document (per copy)

27.00

Enquiries/Searching historic records

Per hour or part hour

37.00

Responses to professional letters for commercial purposes

 

75.00

Pre-application advice

First hour

Free

Subsequent hours/part hours

37.00

Our tables above provide details of all our current charges from 1 April 2024. 

The cost for a demolition notice application is £284.00  (vat exempt).  Once your application is received and accepted you will receive an invoice.  Please quote the invoice number when making a payment.

Please note:  In the unlikely event of an application being withdrawn after registration but before the Building Control Officer has commenced work, all charges will be refunded with the exception of a non-refundable deposit of £107.00 (including VAT).

Payments

To make your payment for Building Regulations Applications, you will need to quote your invoice number.